Equipment checklist
Plug-in and feeder runs, elbows, tees, end boxes, risers, and tap sections in copper or aluminum. Keep labels, schedules, accessories, and visible condition tied to the exact Columbus, OH lot.
Columbus, OH / 225 A–5,000 A
A Columbus evaluation can cover one asset or a coordinated lot. Document the bus duct and busway, the release schedule, condition, quantity, and path to grade so the equipment and project scope can be reviewed together.

Columbus identification file
Provide manufacturer, amp rating, total footage, joint count, and clear photos of nameplates and fittings. If the Columbus lot is part of a service-entrance modernization, document voltage class, main ratings, transition sections, metering compartments, and utility handoff boundaries. For Ohio records, preserve lineup section order, outage documentation, and the relationship between process loads and the retired distribution equipment.
Plug-in and feeder runs, elbows, tees, end boxes, risers, and tap sections in copper or aluminum. Keep labels, schedules, accessories, and visible condition tied to the exact Columbus, OH lot.
For the Columbus bus duct and busway file, include ownership, operating status, quantity, floor or pad position, clearances, released work area, loading route, and the proposed evaluation date.
Secure server-side form