Equipment checklist
Plug-in and feeder runs, elbows, tees, end boxes, risers, and tap sections in copper or aluminum. Keep labels, schedules, accessories, and visible condition tied to the exact Decatur, IL lot.
Decatur, IL / 225 A–5,000 A
A Decatur evaluation can cover one asset or a coordinated lot. Document the bus duct and busway, the release schedule, condition, quantity, and path to grade so the equipment and project scope can be reviewed together.

Decatur identification file
Provide manufacturer, amp rating, total footage, joint count, and clear photos of nameplates and fittings. If the Decatur lot is part of a production-line retrofit, connect each asset to the affected line or cell and preserve buckets, controls, and schedules removed with it. For Illinois records, separate building-owned distribution gear from tenant assets and retain one-line references when they are available.
Plug-in and feeder runs, elbows, tees, end boxes, risers, and tap sections in copper or aluminum. Keep labels, schedules, accessories, and visible condition tied to the exact Decatur, IL lot.
For the Decatur bus duct and busway file, include ownership, operating status, quantity, floor or pad position, clearances, released work area, loading route, and the proposed evaluation date.
Secure server-side form