Equipment checklist
Plug-in and feeder runs, elbows, tees, end boxes, risers, and tap sections in copper or aluminum. Keep labels, schedules, accessories, and visible condition tied to the exact Niles, OH lot.
Niles, OH / 225 A–5,000 A
A Niles evaluation can cover one asset or a coordinated lot. Document the bus duct and busway, the release schedule, condition, quantity, and path to grade so the equipment and project scope can be reviewed together.

Niles identification file
Provide manufacturer, amp rating, total footage, joint count, and clear photos of nameplates and fittings. If the Niles lot is part of a electrical-room cleanout, photograph each wall in sequence and mark what stays, what is released, and what has already been disconnected. For Ohio records, preserve lineup section order, outage documentation, and the relationship between process loads and the retired distribution equipment.
Plug-in and feeder runs, elbows, tees, end boxes, risers, and tap sections in copper or aluminum. Keep labels, schedules, accessories, and visible condition tied to the exact Niles, OH lot.
For the Niles bus duct and busway file, include ownership, operating status, quantity, floor or pad position, clearances, released work area, loading route, and the proposed evaluation date.
Secure server-side form