Equipment checklist
Fusible and breaker-style plugs, including discontinued systems and mixed spares-room lots. Keep labels, schedules, accessories, and visible condition tied to the exact Dayton, OH lot.
Dayton, OH / 30 A–1,200 A
A Dayton evaluation can cover one asset or a coordinated lot. Document the bus plugs, the release schedule, condition, quantity, and path to grade so the equipment and project scope can be reviewed together.

Dayton identification file
Photograph the label, handle, enclosure, and stab side when it can be done safely. If the Dayton lot is part of a property turnover, separate seller-owned equipment from tenant assets and document the date the room becomes available. For Ohio records, preserve lineup section order, outage documentation, and the relationship between process loads and the retired distribution equipment.
Fusible and breaker-style plugs, including discontinued systems and mixed spares-room lots. Keep labels, schedules, accessories, and visible condition tied to the exact Dayton, OH lot.
For the Dayton bus plugs file, include ownership, operating status, quantity, floor or pad position, clearances, released work area, loading route, and the proposed evaluation date.
Secure server-side form