Equipment checklist
Pad-mount, dry-type, cast-coil, liquid-filled, unit-substation, and station-class units. Keep labels, schedules, accessories, and visible condition tied to the exact Lafayette, IN lot.
Lafayette, IN / 75 kVA–50 MVA
A Lafayette evaluation can cover one asset or a coordinated lot. Document the transformers, the release schedule, condition, quantity, and path to grade so the equipment and project scope can be reviewed together.

Lafayette identification file
Nameplate photos, kVA/MVA, primary and secondary voltage, fluid type, test history, and access are most useful. If the Lafayette lot is part of a planned shutdown, tie the release date to the outage window and show which sections are isolated from the remaining lineup. For Indiana records, connect machinery feeds, motor-control assets, and plant release windows to the exact takeout list.
Pad-mount, dry-type, cast-coil, liquid-filled, unit-substation, and station-class units. Keep labels, schedules, accessories, and visible condition tied to the exact Lafayette, IN lot.
For the Lafayette transformers file, include ownership, operating status, quantity, floor or pad position, clearances, released work area, loading route, and the proposed evaluation date.
Secure server-side form