Equipment checklist
Copper and aluminum feeder cable, medium-voltage cable, control wire, full reels, partial reels, and recovered runs. Keep labels, schedules, accessories, and visible condition tied to the exact Aurora, IL lot.
Aurora, IL / #12 AWG–1,000 MCM
A Aurora evaluation can cover one asset or a coordinated lot. Document the wire and cable, the release schedule, condition, quantity, and path to grade so the equipment and project scope can be reviewed together.

Aurora identification file
List conductor material, size, conductor count, insulation, approximate footage, and whether material is on reels. If the Aurora lot is part of a property turnover, separate seller-owned equipment from tenant assets and document the date the room becomes available. For Illinois records, separate building-owned distribution gear from tenant assets and retain one-line references when they are available.
Copper and aluminum feeder cable, medium-voltage cable, control wire, full reels, partial reels, and recovered runs. Keep labels, schedules, accessories, and visible condition tied to the exact Aurora, IL lot.
For the Aurora wire and cable file, include ownership, operating status, quantity, floor or pad position, clearances, released work area, loading route, and the proposed evaluation date.
Secure server-side form