Equipment checklist
Copper and aluminum feeder cable, medium-voltage cable, control wire, full reels, partial reels, and recovered runs. Keep labels, schedules, accessories, and visible condition tied to the exact Decatur, IL lot.
Decatur, IL / #12 AWG–1,000 MCM
A Decatur evaluation can cover one asset or a coordinated lot. Document the wire and cable, the release schedule, condition, quantity, and path to grade so the equipment and project scope can be reviewed together.

Decatur identification file
List conductor material, size, conductor count, insulation, approximate footage, and whether material is on reels. If the Decatur lot is part of a production-line retrofit, connect each asset to the affected line or cell and preserve buckets, controls, and schedules removed with it. For Illinois records, separate building-owned distribution gear from tenant assets and retain one-line references when they are available.
Copper and aluminum feeder cable, medium-voltage cable, control wire, full reels, partial reels, and recovered runs. Keep labels, schedules, accessories, and visible condition tied to the exact Decatur, IL lot.
For the Decatur wire and cable file, include ownership, operating status, quantity, floor or pad position, clearances, released work area, loading route, and the proposed evaluation date.
Secure server-side form