Equipment checklist
Complete lineups, vertical sections, starter buckets, VFD sections, soft starts, and spares. Keep labels, schedules, accessories, and visible condition tied to the exact Aurora, IL lot.
Aurora, IL / 480 V–7.2 kV
A Aurora evaluation can cover one asset or a coordinated lot. Document the motor control centers, the release schedule, condition, quantity, and path to grade so the equipment and project scope can be reviewed together.

Aurora identification file
Provide lineup length, voltage, manufacturer, bucket schedule, main rating, and removal access. If the Aurora lot is part of a property turnover, separate seller-owned equipment from tenant assets and document the date the room becomes available. For Illinois records, separate building-owned distribution gear from tenant assets and retain one-line references when they are available.
Complete lineups, vertical sections, starter buckets, VFD sections, soft starts, and spares. Keep labels, schedules, accessories, and visible condition tied to the exact Aurora, IL lot.
For the Aurora motor control centers file, include ownership, operating status, quantity, floor or pad position, clearances, released work area, loading route, and the proposed evaluation date.
Secure server-side form