Equipment checklist
Diesel and natural-gas sets, open-skid or enclosed, with transfer switches and paralleling gear. Keep labels, schedules, accessories, and visible condition tied to the exact Aurora, IL lot.
Aurora, IL / 100 kW–3 MW
A Aurora evaluation can cover one asset or a coordinated lot. Document the generators, the release schedule, condition, quantity, and path to grade so the equipment and project scope can be reviewed together.

Aurora identification file
Share model, serial, kW rating, voltage, fuel, hours, condition, and removal access. If the Aurora lot is part of a property turnover, separate seller-owned equipment from tenant assets and document the date the room becomes available. For Illinois records, separate building-owned distribution gear from tenant assets and retain one-line references when they are available.
Diesel and natural-gas sets, open-skid or enclosed, with transfer switches and paralleling gear. Keep labels, schedules, accessories, and visible condition tied to the exact Aurora, IL lot.
For the Aurora generators file, include ownership, operating status, quantity, floor or pad position, clearances, released work area, loading route, and the proposed evaluation date.
Secure server-side form