Equipment checklist
Complete lineups, vertical sections, starter buckets, VFD sections, soft starts, and spares. Keep labels, schedules, accessories, and visible condition tied to the exact Dayton, OH lot.
Dayton, OH / 480 V–7.2 kV
A Dayton evaluation can cover one asset or a coordinated lot. Document the motor control centers, the release schedule, condition, quantity, and path to grade so the equipment and project scope can be reviewed together.

Dayton identification file
Provide lineup length, voltage, manufacturer, bucket schedule, main rating, and removal access. If the Dayton lot is part of a property turnover, separate seller-owned equipment from tenant assets and document the date the room becomes available. For Ohio records, preserve lineup section order, outage documentation, and the relationship between process loads and the retired distribution equipment.
Complete lineups, vertical sections, starter buckets, VFD sections, soft starts, and spares. Keep labels, schedules, accessories, and visible condition tied to the exact Dayton, OH lot.
For the Dayton motor control centers file, include ownership, operating status, quantity, floor or pad position, clearances, released work area, loading route, and the proposed evaluation date.
Secure server-side form