
Findlay, OH · Electrical Transformer Buyers
Findlay, OH Electrical Transformer Buyers
We purchase transformers throughout Findlay and the surrounding Ohio market. That includes equipment still energized and scheduled for replacement, equipment already isolated after a shutdown, and whole electrical rooms coming out of a building change. We buy it and we remove it — one offer, one crew, one certificate of insurance.
Same-day written offer
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm CT. We never resell your contact information.
- Location
- Findlay, OH
- Desk
- Electrical Transformer Buyers
- Ratings
- 75 kVA – 50 MVA, oil-filled and dry-ty
- Offer
- Same business day
- Payment
- Before load-out
- Phone
- 954-740-1983
This city
Transformers buyers serving Findlay
Ohio is the single busiest state on this site, and it is not close. The steel corridor from Cleveland through Youngstown and down to Steubenville runs arc furnace and rolling mill electrical systems at voltages most contractors never see, and when a line comes down the substation transformers, medium-voltage switchgear and bus duct come out as one lot. Add the glass and automotive plants around Toledo, the Honda supplier network across the central part of the state, the chemical operations along the Ohio River, and the Columbus data center build-out that keeps retiring perfectly serviceable switchgear on upgrade cycles. FirstEnergy and AEP Ohio standardization programs release pad-mount and substation transformers in quantity. Our crews run I-71 and I-77 constantly, so Ohio freight almost never changes an offer. For Findlay specifically that density helps: crews already move through Cleveland, Columbus, Cincinnati, Toledo and Dayton, so mobilization is a scheduling question rather than a cost problem.
Once an offer is accepted we schedule around your outage, not ours. Night, weekend and phased removals in Findlay are ordinary work. Crews arrive with their own rigging, lifts and containment, protect the floors and leave the room broom clean.
| Item | Detail |
|---|---|
| Ratings | 75 kVA – 50 MVA, oil-filled and dry-type |
| Scope | Pad-mount, dry-type, cast coil, substation |
| Nameplates | ABB, General Electric, Square D, Eaton, Cooper, Howard, Federal Pacific, Siemens, Waukesha, Kuhlman, Westinghouse, Delta Star, Pennsylvania Transformer, Hammond, Acme |
| Condition | Working, retired, water-damaged or already dismantled |
| Minimum | One section, one unit, or a whole plant lot |
Equipment
What we take out of Findlay sites
Liquid-filled pad-mount and station class
Oil-filled pad-mount and pole-mount units, loop-feed and radial, unit substations with their primary switching and secondary sections, and station-class power transformers with tap changers, radiators and conservators. Oil is tested for PCB content before anything moves, and the manifests come with your paperwork.
Dry-type and cast coil
Ventilated dry-type and cast-coil units from 15 kVA through 5 MVA, including 480 V to 208 V step-downs, K-rated units specified for harmonic loads, and drive isolation transformers. Dry-types move easily, resell quickly and generally carry a strong number relative to their weight.
Ohio specifics
Ohio is the single busiest state on this site, and it is not close. The steel corridor from Cleveland through Youngstown and down to Steubenville runs arc furnace and rolling mill electrical systems at voltages most contractors never see, and when a line comes down the substation transformers, medium-voltage switchgear and bus duct come out as one lot. Add the glass and automotive plants around Toledo, the Honda supplier network across the central part of the state, the chemical operations along the Ohio River, and the Columbus data center build-out that keeps retiring perfectly serviceable switchgear on upgrade cycles. FirstEnergy and AEP Ohio standardization programs release pad-mount and substation transformers in quantity. Our crews run I-71 and I-77 constantly, so Ohio freight almost never changes an offer.
Nearby
Nearby and related
Other Ohio locations where we buy transformers:
Common questions
Findlay questions
Do you provide documentation for surplus property or audit records?
Yes. Itemized purchase agreements, weight tickets, bills of lading, oil disposal manifests and recycling documentation are standard on Findlay purchases. Public agencies and audited facilities get the paperwork their process requires without having to ask twice.
Do you actually buy electrical equipment in Findlay, or just broker it?
We buy it. Midwest Electrical Buyers is the purchaser of record — we fund the purchase, send our own crews to Findlay to disconnect and load, and take title when the equipment leaves your dock. There is no third party behind us waiting to approve the price.
What is the smallest job you will take in Findlay?
A single transformer, one switchgear section, a pallet of breakers or a few boxes of breakers is worth a call. Because we route crews across Ohio continuously, small Findlay pickups usually get added to an existing run rather than priced as a dedicated trip.
How fast can you get to a Findlay site?
Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to Findlay is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.
Do we have to disconnect the equipment before you arrive?
No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the Findlay room is still partly live we phase the work.
Transformers in Findlay?
One call, one written offer, one crew. Payment before the trailer leaves.